A project to install a new air conditioning system in an office building has started. The design drawings were previously finalized. However, due to some changes in design, the layout of the building is modified. As the work progresses, the HVAC contractor brings up a technical issue that Occurred due to the modified bending of a couple of vent pipes. Due to this issue, one part of the building does not receive proper ventilation.
What should the construction professional have done to prevent this from happening?