Question 1


A construction professional is in charge of a construction project that involves multiple interfaces between the structural and HVAC work packages. The design drawings were approved before the construction stage. During construction, due to some design changes, the building layout was modified. While reviewing the revised construction drawings during one of the coordination meetings, an HVAC contractor notes that the latest drawings missed some vital technical information for HVAC installation.
What should the construction professional have done to prevent this situation?