H12-893 HCIP-Data Center Network — Question 42
H12 893 Part2 2 · question 42 of 130 in the H12-893 HCIP-Data Center Network question bank. Pick an answer to check it, or join the discussion below.
Question 42 (Q47)
To reduce the configuration workload of the network administrator, an enterprise deploys a service system in the computing scenario of Huawei CloudFabric Solution. After receiving service requirements from the department, the administrator performs the following steps to provision services:
1. Add hosts to FusionCompute and create a distributed virtual switch.
2. Create VMM mappings to generate a port group for the distributed virtual switch.
3. Select a host and create VMs.
4. iMaster NCE-Fabric detects VM login and automatically delivers port and gateway configurations.
5. Create tenants and VPCs on iMaster NCE-Fabric and create logical networks in the VPCs. Which of the following is the correct order of these steps?