Question 118
A network administrator must create a daily scheduler job on a Cisco Nexus 9000 Series Switch to back up the device configuration and transfer the backed-up configuration to an external server. The backup task must meet these requirements: 1. The backup file must be saved in a directory named config_backup on the external server. 2. The switch must send an email notification to the administrator when the job is complete. 3. The scheduler job must be configured to run every day at 11 PM. Which commands must be run on the switch?