Question 55


A Cisco ACI fabric must be integrated with a VMware vSphere environment. One of the ESXi hosts is still disconnected from the Distributed Virtual Switch (DVS) and the VMM domain. Two EPGs have already been created and associated with the VMM domain. An engineer must prepare the ACI configuration such that:
1. EPG contracts must be sent to ACI leaf switches before a hypervisor is attached to the DVS.
2. EPG contracts must be pushed to leaf hardware as soon as the policy is downloaded into the leaf software.
Which EPG configuration must be used to meet these requirements?

Checking access…

Discussion

Loading comments…

← Back to question bank